Question
MGT635-1003B-04 International Business Operations Management
Assignment Name: Unit 5 Individual Project
Deliverable Length: 6-7 body pages
Details: As the production manager for an electronic circuit company you have encountered the following situation.
Part 1
A process for producing electronic circuits has achieved very high yield levels. An average of only 10 defective parts per million is currently produced.
1.What are the upper and lower control limits for a sample size of 100?
2.Recompute the upper and lower control limits for a sample size of 10,000?
3.Which of these two sample sizes would you recommend? Explain.
Part 2
Management has reconsidered the method of quality control and has decided to use process control by variables instead of attributes. For variables control a circuit voltage will be measured based on a sample of only five circuits. The past average voltage for samples of size 5 has been 3.1 volts, and the range has been 1.2 volts.
1.What would the upper and lower control limits be for the resulting control charts (average and range)?
2.Five samples of voltage are taken with the results in the table below. What action should be taken if any?
3.Discuss the pros and cons of using this variables control chart versus the control chart discussed in the first part of the assignment. Which do you prefer?
Sample 1 2 3 4 5
x 3.6 3.3 2.6 3.9 3.4
R 2.0 2.6 0.7 2.1 2.3
Assignment Name: Unit 5 Individual Project
Deliverable Length: 6-7 body pages
Details: As the production manager for an electronic circuit company you have encountered the following situation.
Part 1
A process for producing electronic circuits has achieved very high yield levels. An average of only 10 defective parts per million is currently produced.
1.What are the upper and lower control limits for a sample size of 100?
2.Recompute the upper and lower control limits for a sample size of 10,000?
3.Which of these two sample sizes would you recommend? Explain.
Part 2
Management has reconsidered the method of quality control and has decided to use process control by variables instead of attributes. For variables control a circuit voltage will be measured based on a sample of only five circuits. The past average voltage for samples of size 5 has been 3.1 volts, and the range has been 1.2 volts.
1.What would the upper and lower control limits be for the resulting control charts (average and range)?
2.Five samples of voltage are taken with the results in the table below. What action should be taken if any?
3.Discuss the pros and cons of using this variables control chart versus the control chart discussed in the first part of the assignment. Which do you prefer?
Sample 1 2 3 4 5
x 3.6 3.3 2.6 3.9 3.4
R 2.0 2.6 0.7 2.1 2.3
Answers
Please be aware that no one here will do your work for you. However, we will be happy to read over whatever you come up with and make suggestions and/or corrections.
<b>Please post what <u>you think.</b></u>
<b>Please post what <u>you think.</b></u>
Related Questions
Assignment Detail
MGT240-1003A-01 Business Management and Leadership
Assignment Name: Unit 3...
Assignment Type: Individual Project Deliverable Length: 1-2 pages
Points Possible: 130 Due...
I have the first part done with either Marriott Intl or southwest airlines it is the second and thir...
Unit 5 Individual Project
Deliverable Length: 4-5 body pages, 1 PERT chart, 1 Gantt chart
Detail...