Question
If 2/3 of the gravel cover 3/4of a driveway, how much tons of gravel are required to cover the entire driveway
Answers
GPT 3.5
To find the total amount of gravel required to cover the entire driveway, we need to combine the fractions that represent the coverage.
2/3 of the gravel covers 3/4 of the driveway. This can be represented as:
(2/3) * (3/4) = 6/12 = 1/2
So, 1/2 of the gravel is required to cover the entire driveway.
Therefore, to cover the entire driveway, the gravel required would be equal to the total amount of gravel that covers 1/2 of the driveway, which is equal to 1 ton.
2/3 of the gravel covers 3/4 of the driveway. This can be represented as:
(2/3) * (3/4) = 6/12 = 1/2
So, 1/2 of the gravel is required to cover the entire driveway.
Therefore, to cover the entire driveway, the gravel required would be equal to the total amount of gravel that covers 1/2 of the driveway, which is equal to 1 ton.
Related Questions
At a construction site, 20,000 pounds of gravel are needed to create a driveway with an area of 400...
Ali measures the rectangular area of his driveway he wants to fill with gravel to be 4 yards by 50 y...
If 2/3 ton of gravel covers three 3/4 of a driveway, how many tons of gravel are required to cover t...
Calvin is mixing colored gravel for the bottom of his fish tank. He mixes 12 pounds of blue gravel w...