When should a plumbing rough in inspection be called in

Answers

GPT 3.5
A plumbing rough in inspection should be called in after all plumbing lines and fittings have been installed but before any fixtures or appliances are connected. This inspection is typically done before the walls are closed up to ensure that all plumbing work meets building code requirements and is properly installed. It is important to schedule this inspection at the appropriate time to avoid any potential issues down the road.