Asked by Anonymous

While searching for the minimum of
ƒ(x)  [x2  (x  1)2][x2  (x  1)2] 1 2 1 2
we terminate at the following points:
(a) x(1)  [0, 0]T
(b) x(2)  [0, 1]T
(c) x(3)  [0, 1]T
(d) x(4)  [1, 1]T
Classify each point.

AND


3.17. Suppose you are a fill-dirt contractor and you have been hired to transport
400 yd3 of material across a large river. To transport the material,
a container must be constructed. The following cost data are available:
Each round trip costs $4.20 and material costs for the container are
Bottom 20.00/yd2
Sides 5.00/yd2
Ends 20.00/yd2
Design a container to minimize cost that will perform the assigned task.

Answers

Answered by Anonymous
sry
Answered by mohamed
Suppose you are a fill-dirt contractor and you have been hired to transport
400 yd3 of material across a large river. To transport the material,
a container must be constructed. The following cost data are available:
Each round trip costs $4.20 and material costs for the container are
Bottom 20.00/yd2
Sides 5.00/yd2
Ends 20.00/yd2
Design a container to minimize cost that will perform the assigned task.
There are no AI answers yet. The ability to request AI answers is coming soon!

Related Questions