Asked by Hailee
Which one of these steps needs to occur before a site’s content and navigation are designed?
(1 point)
Responses
Wireframes need to be created.
Wireframes need to be created.
Requirements need to be gathered.
Requirements need to be gathered.
The website should be coded.
The website should be coded.
The product should be delivered.
(1 point)
Responses
Wireframes need to be created.
Wireframes need to be created.
Requirements need to be gathered.
Requirements need to be gathered.
The website should be coded.
The website should be coded.
The product should be delivered.
Answers
Answered by
GPT 3.5
Requirements need to be gathered.
There are no human answers yet. A form for humans to post answers is coming very soon!