Which of the following is a consequence of choosing the wrong code or standard for a job?

The cost of fabrication is lowered.

The quality of the weld is improved.

The cost of fabrication may be too high.

There is no consequence of choosing the wrong code or standard.

1 answer

The cost of fabrication may be too high.