A hoist powered by a 10 kw motor is used to raise a bucket filled wirh concrete and having total mass of 500 kg to height of 80 m. if the efficiency of the hoist is 80 percent, find Time needed
5 years ago

Answers

R_scott
m g h = 500 * 9.8 * 80 Joules

80% of 10 kw is 8 kJ per second

looks like about a minute
5 years ago
Mike
A hoist powered by a 15-kW motor is used to raise a bucket filled with concrete and having a total mass of 500 kg to a height of 60 m
3 years ago

Related Questions

To hoist himself into a tree, a 71.0-kg man ties one end of a nylon rope around his waist and throws... A piano of mass 800 kg is hoisted up to a 15 meter height. Just then, the rope breaks with the piano... A crane is used to hoist a 500kg crate vertically at a constant velocity of 4 meters per second. Ign... an electric hoist is used to life a piece of equipment y = 2.6 feet. the diameter on the hoist is x... A hydraulic hoist has a ram of 30 cm diameter and a plunger of 1 cm diameter. If 70 N effort is appl... A construction hoist does 2.74x10⁴J of work in lifting a load of bricks from the street to the roof... How is the work done to hoist the counterweight related to the potential energy of the counterweight... An electric hoist is used to lift a piece of equipment y = 3 feet. (see figure in the link below). T... A mine hoist What do the Hoist cable and Shave wheel do exactly
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use