Ask a New Question
Search
Asked by
Wendy
An electric motor is used to lift a load of bricks through a vertical height of 20m.the tension in the cable attached to the electric motor is 2000N.calculate work done by the electric motor on the bricks
Answers
Answers
Answered by
R_scott
work = force * distance
Related Questions
Related
A 280 electric motor is 90% efficient, meaning that 90% of the energy supplied to it ends up as mec...
an electric motor is used to pull a 125 kg box across a floor using a long cable. the tension in the...
An electric motor is used to pull a 125 kg box across a floor using a long cable. the tension in the...
a 1.00 x 10 W electric motor is used to life a 955 kg object vertically 25.0 m at a constant velocit...
a 4.5kw electric motor is 90% efficient.how much energy it use in 20 seconds.
In an electric motor, at the moment that the half-turn of the rotor (central electromagnet) complete...
If an electric motor uses 50 kJ of energy to do 46 kJ of work, how efficient is it?