Question
How much work is done when a mass of 3 kg (weighing 30 N)
is lifted vertically through 6 m?.
A hiker climbs a hill 300 m high. If she has a mass of 50 kg
calculate the work she does in lifting her body to the top of the
hill.
is lifted vertically through 6 m?.
A hiker climbs a hill 300 m high. If she has a mass of 50 kg
calculate the work she does in lifting her body to the top of the
hill.
Answers
work = force * distance = 30 N * 6 m
... answer is in Joules
work = m g h = 50 * 9.8 * 300
... answer is in Joules
work = m g h = 50 * 9.8 * 300
Thank you
Related Questions
A hiker climbs a hill 300m high.If she weighs 50kg,calculate the work she does in lifting her body t...
An 80 kg hiker climbs a 1000 m high hill at a constant speed. If the hiker's body is 25% efficient,...
A hiker climbs a hill 300m high and weighs 50kg. Calculate the power if she takes 1 hour to climb th...
A bicyclist maintains a constant speed of 4.00 m/s up a hill that is inclined at 10.0
∘
with the...