Ask a New Question

Asked by Jennifer

A simple lever is used to lift a heavy load. When a 58-N force pushes one end of the lever down 1.1 m the load rises 0.14 m. How much work is done by the 58-N force? What is the gain in potential energy of the load? How does the work done compare to the increased potential energy of the load?
9 years ago

Answers

Related Questions

A simple lever is used to lift a heavy load. When a 60-N force pushes one end of the lever down 1.2... A lever is used to lift a heavy load. A 50 N force pushes one end of the lever down 1.2 m and the l... A simple lever is used to lift a heavy load. When a 60 N force pushes one end of the lever down 1.0... A simple lever is used to lift a heavy load. When a 60 N force pushes one end of the lever down 1.0... 2. A lever is used to lift an object with a weight of 60 Newtons. The effort force is 15 meters from... Amir uses a lever to lift a box. Where does inefficiency occur in the lever?(1 point) Responses wher... A lever is used to lift a heavy box with an input arm of 4 meters and and output arms on 0.8 meters.... Amir uses a lever to lift a box. Where does inefficiency occur in the lever?(1 point) Responses...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use