Consider the following system:
-> 0.73 -> 0.73 ->
Determine the probability that the system will operate under each of these conditions:
(Round your final answers to 4 decimal places, not your intermediate calculations.)
a.) The system as shown
b.) Each system component has a backup with a probability of .73 and a switch that is 100% percent reliable.
c.) Backups with .73 probability and a switch that is .98 percent reliable.
My answers:
a.) 0.5329
b.) 0.8595
c.) 0.8542
Concern & Question:
Problem C.) ~ I calculated this problem by
1-.73= .27
1-.73= .27
1-.98= .02
.27*.27*.02= .001458
1-.001458= .8542
Did I calculate this problem (C.) correctly?
If not, how do I calculate this problem?
(Step by step, please...) and what should be the answer?
Thank you so much for your help!