Asked by lifeontwofeet
Here is another one that I am having trouble with.
Julio works as a quality control expert in a beverage factory.The assembly line that he monitors produces about 20,000 bottles in a 24-hour period. Julio samples about 120 bottles an hour and rejects the line if he finds more than 1/50 of the sample to be defective. About how many defective bottles should Julio allow before rejecting the entire line?
Again, I do not want the ANSWER, I need to understand the equation to use to solve it.
Julio works as a quality control expert in a beverage factory.The assembly line that he monitors produces about 20,000 bottles in a 24-hour period. Julio samples about 120 bottles an hour and rejects the line if he finds more than 1/50 of the sample to be defective. About how many defective bottles should Julio allow before rejecting the entire line?
Again, I do not want the ANSWER, I need to understand the equation to use to solve it.
Answers
Answered by
Ms. Sue
1/50 * 120 = ?
or
0.02 * 120 = ?
or
0.02 * 120 = ?
Answered by
justdontkno
2.40 i think
Answered by
Ms. Sue
Right. So when Julio finds the third defective bottle in his sample, he needs to reject the entire line.
There are no AI answers yet. The ability to request AI answers is coming soon!
Submit Your Answer
We prioritize human answers over AI answers.
If you are human, and you can answer this question, please submit your answer.