Question
A force paralled to an inclined plane is used to raise a load of 500N through a height of 3M While the load moves a distance of 30M along the plane (a) How much work is done on the load ? (b)if the efficency is 80% calculate the effort (c)how much work is done by the effort
Answers
Work done on the load = l *ld
500*30= 15,000j
2. Eff= output/input*percent
80=500*3*30*100/input
Cross multiple effort = 56,250j
500*30= 15,000j
2. Eff= output/input*percent
80=500*3*30*100/input
Cross multiple effort = 56,250j
Related Questions
The floor of a lorry is 2.0m high. A plank 5m long is used as an inclined plane to raise some load u...
. An inclined plane which makes slopes at 37° is used to raise a 10kg object to an If the efficiency...
An inclined plane, which slopes at 37 o, is used to raise a 10kg object to a height of 4m. If the ef...
the floor of a lorry is 2.0m high,a plank 5m long is used as an inclined lane to raise some load up...