How much work is done in lifting 450 lb of cement 75 ft above the ground?

So basically its W=fs
(450lb)(75ft)=33750lb
11 years ago

Answers

Related Questions

What is the work done in lifting 60 kg of blocks to a height of 20m? How much work is done in lifting a 6kg object from the ground to a height of 4m? A 12n object is... A pump of 200 W power is lifting 2 kg water from an average depth of 10 meters per second. Find the... How much work is done in lifting a 300 Newton rock 10 meters from the ground? A construction worker is lifting a load of bricks onto a truck. She does 200J of work in 40 seconds... A construction worker is lifting a load of bricks onto a truck. She does 200J of work in 40 seconds... How much work is done by lifting a 20.0 kg rock off the ground 3.0 m high? ENTER A NUMERICAL VALUE O... When using your body for lifting heavy objects, you should avoid turning, bending, moving, twisting? His neck was in pain and lifting his hand to it found it horribly swollen. He knew that it had a cir...
Ask a New Question
Archives Contact Us Privacy Policy Terms of Use